SAP Certification Exams C_TS422_2601 Exam Dumps and Certification Test Engine [Q56-Q75]

Share

(PDF) SAP Certification Exams C_TS422_2601 Exam and Certification Test Engine

Use C_TS422_2601 Exam Dumps (2026 PDF Dumps) To Have Reliable C_TS422_2601 Test Engine

NEW QUESTION # 56
What information do you have to maintain to define the relationship between supply source dem source in the Kanban process?
Note: There are 2 correct answers to this question.

  • A. Production supply area
  • B. Replenishment strategy
  • C. Routing
  • D. Work Center

Answer: A,B


NEW QUESTION # 57
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning?
Note: There are 2 correct answers to this question.

  • A. Assign the alert profile to the overall profile.
  • B. Create an object selection variant for alerts according to the priority of ATP categories.
  • C. Create an object selection variant for productionplanningrelated alerts.
  • D. Assign the overall profile to the authorization profile.

Answer: A,C


NEW QUESTION # 58
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.

  • A. Planning mode > Order priority
  • B. Scheduling control > Find slot
  • C. Planning mode > Bucket
  • D. Scheduling control > Close gap

Answer: B,C


NEW QUESTION # 59
What does forecasting in the dem planning cycle include?
Note: There are 3 correct answers to this question.

  • A. Market intelligence
  • B. Oneoff events
  • C. Past quotation quantities
  • D. Past production planning quantities
  • E. Past sales order quantities

Answer: A,B,E


NEW QUESTION # 60
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials?
There are 2 correct answers to this question.

  • A. Warehouse number data
  • B. Production version data
  • C. MRP area data
  • D. Storage location data

Answer: A,D


NEW QUESTION # 61
For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.

  • A. In productrelated COC all costs are debited credited to a product cost collector.
  • B. Productrelated COC is used in manufacturing for coproducts.
  • C. In orderrelated COC individual production orders do NOT have cost segments.
  • D. Orderrelated COC is beneficial in a flexible production environment.

Answer: A,D


NEW QUESTION # 62
During production order creation several valid production versions are found. How does the system choose the production version?

  • A. Alphanumeric or quota arrangement
  • B. Lot size or material cost
  • C. Validity period or sales order
  • D. Planned order or material number

Answer: A


NEW QUESTION # 63
You want to trigger inhouse production of a semifinished material before a sales order for the corresponding finished good is received.Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semifinished material?

  • A. Assembly processing with production orders (82)
  • B. Production by lot size (30)
  • C. Planning with final assembly (40)
  • D. Planning at assembly level (70)

Answer: D


NEW QUESTION # 64
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing?
Note: There are 3 correct answers to this question.

  • A. Create associated capacity requirements.
  • B. Post production costs to the planned order.
  • C. Reduce run schedule quantities.
  • D. Update statistics for the Business Information Warehouse.
  • E. Post the goods receipt for the finished product.

Answer: A,B,C


NEW QUESTION # 65
Which SAP applications can be used for forecasting in Supply Chain Planning?
Note: There are 2 correct answers to this question.

  • A. Capacity Requirements Planning (CRP)
  • B. Integrated Business Planning (IBP)
  • C. Supply Chain Management (SCM)
  • D. Material Requirements Planning (MRP)

Answer: B,C


NEW QUESTION # 66
You have maintained the parameters for simple discontinuation in the material master of a component.
Which business process will be affected if the available stock is zero the discontinuation date is in the past?

  • A. Kanban
  • B. Material requirements planning
  • C. Production order release
  • D. Back flushing

Answer: B


NEW QUESTION # 67
Which options do you have to plan both quantities capacities during line loading in repetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Run MRP with quota arrangement.
  • B. Run MRP with automatic selection of production version.
  • C. Run PP/DS heuristics for repetitive manufacturing.
  • D. Assign planned orders manually in the planning table.

Answer: A,C


NEW QUESTION # 68
What is a prerequisite for consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?

  • A. A sales order is delivered.
  • B. MRP creates a planned order.
  • C. MRP creates a dependent requirement.
  • D. A sales order is created.

Answer: D


NEW QUESTION # 69
You run MRP for a material that was planned using Demand-Driven Replenishment. Towards which buffer level does the MRP run create a replenishment proposal?
Please choose the correct answer.

  • A. Top of Red
  • B. Top of Green
  • C. Top of Yellow
  • D. Top of Red Base

Answer: B


NEW QUESTION # 70
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching?
Note: There are 2 correct answers to this question.

  • A. Queue time
  • B. Setup time
  • C. Move time
  • D. Teardown time

Answer: A,C


NEW QUESTION # 71
How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.

  • A. They are created on assembly level during the planning run.
  • B. They are created together with the independent requirement for the finished product.
  • C. They are created with exact times in Advanced Planning.
  • D. They are only created for multilevel bill of material (BOM) structures.

Answer: A,C


NEW QUESTION # 72
What could be the reason for different combinations of components in a multiple bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. Lot size
  • B. BOM component status
  • C. Manufacturing date
  • D. BOM header status

Answer: A,C


NEW QUESTION # 73
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.

  • A. Total replenishment lead time
  • B. Setup time
  • C. Float after production
  • D. Opening period

Answer: B,C


NEW QUESTION # 74
Why would you use phantom assemblies?
Note: There are 3 correct answers to this question.

  • A. To increase the number of planning levels
  • B. To make the assignment of components easier
  • C. To simplify the structure of bills of material
  • D. To reduce the number of material masters
  • E. To reduce the number of changes required in bills of material

Answer: B,C,E


NEW QUESTION # 75
......

C_TS422_2601 Dumps Full Questions with Free PDF Questions to Pass: https://torrentvce.pdfdumps.com/C_TS422_2601-valid-exam.html